This week things have been moving along on the inside of the house. We have some of our hardwood floors installed. I also saw the cabinets and mirrors for the bathrooms have arrived, yet not installed. The doors arrived also for the bedrooms and closets. Also, our drive way was poured. We are assuming the shape of the drive has to do with the sewer lines.....
No comments:
Post a Comment